For Enquiries:
shrikant.koyande@sinercopower.com
Call us On:
9773066170
Home
About us
Products & Services
LV Switchboard
Power Control Center (PCC)
Motor Control (MCC)
Power Distribution Unit (PDU)
VFD Panel
Automatic Transfer Switch Panels (ATS)
Convert (AC/DC, DC/AC, DC/DC, AC/AC)
Power Quality
Passive Harmonic Filter (PHF)
Active Harmonic Filter (AHF)
Hybrid Power Factor Correction Panel (HPFC)
Static Var Generator Panel (SVG)
LT & HT Power Factor Correction
LT Automatic Power Factor Control Panel (APFC)
HT Automatic Power Factor Control Panel (APFC- Up to 11kV)
Real Time Power Factor Correction Panel (RTPFC)
Building Automation Services
Building Management System (BMS)
Lighting Management System (LMS)
Energy Management System (EMS)
Products and Services
LV Switchboard
Power Control Center (PCC)
Motor Control (MCC)
Power Distribution Unit (PDU)
VFD Panel
Automatic Transfer Switch Panels (ATS)
Convert (AC/DC, DC/AC, DC/DC, AC/AC)
Power Quality
Passive Harmonic Filter (PHF)
Active Harmonic Filter (AHF)
Hybrid Power Factor Correction Panel (HPFC)
Static Var Generator Panel (SVG)
LT & HT Power Factor Correction
LT Automatic Power Factor Control Panel (APFC)
HT Automatic Power Factor Control Panel (APFC- Up to 11kV)
Real Time Power Factor Correction Panel (RTPFC)
Building Automation Services
Building Management System (BMS)
Lighting Management System (LMS)
Energy Management System (EMS)
Careers
FAQ
Contact us
HT APFC PANEL (UP TO 11kV)
HT APFC PANEL (UP TO 11kV)
System Voltage range is 2.2kV to 11kV.
Customized as per site requirements Other output ratings, switching combination or design voltages are available upon request
Heavy duty reactors of high linearity are used for tuned or de-tuned systems.
Incoming/outgoing with Isolators with Vacuum Circuit breakers or fuses
Microcontroller based PF controller suitable of MV applications is used with LCD display, in-built data logging, RS-485 communications (Optional)
Both Auto and Manual operations available by using A/M Selector Switch and On-Off Push Buttons and timers.
Ensure highest PF on a continuous basis thereby ensuring the maximum possible PF rebates and reduced energy bills